Draft agreement · carport-2026-10-10
This plain-language draft has not been reviewed by counsel. Commercial and legal terms below remain open.
One structure, one site
Mythic Engineering provides the listed engineering for one steel-tube carport, for the builder named in this order. Plans are valid only for the entered address and GPS coordinates, which are printed on every sheet. They cannot be reused at another site or for another structure, size, type, class or loading. A different site requires a new order.
Included
Steel frame design, base reactions and anchor rods, longitudinal wind design and rod bracing, frame weld checks, and the drawing set for the carport ordered.
Excluded / open items on the plans
- Screws, clips and sleeves; base-plate thickness and welds.
- Rod and strut end connections; hat-channel strut section; tube-wall limit states of tube-to-tube joints.
- Seismic, footing and soil design.
- Vertical roof pressure from wind parallel to the ridge and torsion load cases.
- Roof and wall panels, purlins and girts; permit submittal; site plan; anything not expressly included.
Your information and materials
Provide the correct site address and coordinates; jurisdiction wind speed, ground snow and exposure; dimensions, type, class and tube gauge. Confirm that you are the builder or are authorized to order. Supply steel with minimum tensile strength of 58 ksi and E70 filler as shown on the plans. Wrong or incomplete information can invalidate the plans and require a new order at your cost.
Changes, permits and inspection
Changes to the plans, steel, bracing, spacing, anchorage, grade or wall thickness require written approval. The builder is responsible for permits, construction to the plans and local inspection. Construction inspection is not included.
Payment, delivery and unregistered states
Payment is required before engineering begins. Plans and notices are intended for delivery to the order email. Where Mythic Engineering is not registered, engineering is issued without a seal or digital signature; the builder is responsible for any local review or sealing required.
Refund terms and the treatment of orders outside the engineering scope are not finalized. Liability, insurance, indemnity, disputes, governing law and venue remain for attorney review. This agreement is still a draft.
Records
The order, issued plans, and acceptance date, time and version are retained. The builder agrees to receive plans and notices by email.